San Diego USD - LB25-0164-08-00-G1, LB25-0164-08-00-P1, LB25-0164-00-P2
Construction and Preconstruction Services for Baker Elementary School Whole Site Modernization, Photovoltaic, and Signage/Canopies (LLB)
00-Ad for Bids
(click to expand/collapse)
Name | Size | ||
Ad for Baker ES WSM PV Graphics | 72.8 KB |
01-Bid Package
(click to expand/collapse)
Name | Size | ||
Baker ES WSM PV Graphics Specifications | 16.6 MB |
02-Appendices
(click to expand/collapse)
Name | Size | ||
Appendix 1 Traditional Instructional Calendars | 98.1 KB | ||
Appendix 2 Baker Bell Schedules | 126.3 KB | ||
Appendix 3 Baker ES Land Map | 539.1 KB | ||
Appendix 4 Baker ES Boring Logs | 1.0 MB | ||
Appendix 5 Baker ES Hazmat Report | 12.9 MB | ||
Appendix 6 Baker ES Hazmat Addendum | 8.4 MB | ||
Appendix 7 Baker ES Phasing Plans | 2.5 MB | ||
Appendix 8 SDG&E Work Order | 5.3 MB | ||
Appendix 9 Baker ES Public Improvement Plans | 22.5 MB | ||
Appendix 10 Baker ES WSM Moving Matrix | 118.1 KB | ||
Appendix 12 Baker ES Keying Statement_and_Documents | 901.1 KB | ||
Appendix 13 04-121600_103_A | 3.1 MB | ||
Appendix 14 Baker ES WSM SWPPP | 34.4 MB | ||
Appendix 15 Const-Sign Template | 105.4 KB | ||
Appendix 16 Baker City Easement Dedication & Vacation Documents | 1.5 MB | ||
Appendix 17 Baker SDG&E Easement Quitclaim | 920.5 KB |
03-As-Builts
(click to expand/collapse)
Name | Size | ||
2000_A#04-102164 20 Schools Boiler-Tank Replacement.zip | 24.2 MB | ||
2000_Multi-Sites Boiler-Pump Expansion Tank Shedule | 8.1 MB |
Prequal List
(click to expand/collapse)
Name | Size | ||
Prequalification GC's and MEP Contractors 8.12.2024 | 185.1 KB |
Site Attendees List
(click to expand/collapse)
Name | Size | ||
Baker ES_Site Visit Attendees | 1.5 MB |